The original
building, a slab-on-grade and concrete warehouse structure built in 1972,
was severely damaged with cracks and deteriorating foundation. We determined
that the building had suffered a major structural failure due to settling
of the Bay mud underlying the foundation.
After
the emergency shoring, in subsequent phases we selected and then repaired
and upgraded an offsite location, the former GM/Volvo Truck Repair Facility.
We then moved the heavy equipment maintenance offsite in order to demolish
the most severely damaged portion of the builidng in 1998. |